ISTANBUL AIRPORT
TURKISH
INTERNATIONAL AIRPORT (ALSO CALLED AS ISTANBUL AIRPORT)
Turkey is also known as the Republic of Turkey. It is
surrounded by eight countries. Iraq and Syria lies to the west, Georgia to the
northeast, Armenia and Iran with Azerbaijan to the east and Greece and Bulgaria
to the northwest. The official language of Turkey is Turkish. Ankara is the
capital city of Turkey whereas Istanbul is the largest city of the country. The
ethnic groups are Turks, Kurds, Arabs, Laz including various other tribes. The total
area of Turkey is 783,356 sq. km.
Ataturk International Airport and Sabiha Gokcen Airport are
the two international airports located in Istanbul and currently On October of
2018, the largest international airport in world was inaugurated with first
flight on 31st October 2018.
So, in this blog we are going to discuss about the newly
opened largest airport ever built, known as the Istanbul Airport. Due to the
air traffic congestion, this airport was planned to be built. Formerly Ataturk
International Airport was the main international airport of the country which
is still the main as the Istanbul Airport is still in construction phase. So,
the Ataturk airport is one of the busiest airports in the Europe and also
additional runways cannot be built as the airport is surrounded on all sides by
other residential structures. There are some aircrafts that are based on Sahiba
Gokcen Airport which already has reached its own maximum terminal capacity. So,
there was the need of other international airport other than these two
airports.
LOCATION
The new Istanbul Airport is located in the intersection of
Arnavutkoy, Gokturk and Catalca, north of the Istanbul city centre and between
the Black Sea coast towns of Yenikoy, Tayakadin and Akpinar. The distance
between the existing Ataturk International Airport and the new Istanbul Airport
will be approximately 35 km. The airport will have the capacity of 90 million
passengers after the first phase is completed and it could be expanded up to
150 million passengers’ capacity for the first phase. After the completion of
all phase the airport will have the capacity of 200 million passengers annually.
The cost of the whole project is estimated up to 7 billion
Euros. After the final completion of all phases of the airport, this airport
will be the largest airport in the world.
AREAS AND CONSTRUCTION
MATERIALS
Nearly 6,172 hectares was state owned
forest area. The area of the construction site is 3,500,000 cubic meters. The
main terminal occupies the area of 1,300,000 cubic meters. The shops and the
restaurants occupy the area of 1,000,000 meters square. There are seven entrances and 300 flight
destinations all over the world. The most
attracting aspect about this airport is its beautiful and magnificent
architecture and designs. There are robot guides for the passengers. The
attracting part is the Air Traffic Control Tower which has the most glamorous architecture
and designed by Pinnifarina and Aecorn.
The airport builders rely on BOMAG COMPACTION TECHNOLOGY,
supports and services. 20 rollers are working on one fill area up to 7 fill
areas on job site working on 800,000 cubic meters per day. The working hours
are up to 20 hours a day and 7 days a week. The layers that are compacted on
the site are 400 mm thick each. Four BW 226 pad foot rollers and one BW 226
smooth drum roller are operated in circle and row. The amount of concrete that
is used to build terminal building is 1,000,000 cubic meters. 180,000 tons of
ferrous reinforcements are used in terminal buildings.
For now there are only four runways in use after the
inauguration but the total number of planned runways to be built is 6. The construction
process was carried out by 58 Liebherr Tower Cranes. Nearly 30, 000 employees
were working for the construction process.
The construction process of this airport was started in May
2015 and the first phase was completed on October 29, 2018. The whole project
is targeted to complete by 2030.
OTHER ASPECTS
According to the Environmental Impact of Assessment Report on
April, 2013, there were 2,513,341 trees and 657,950 of them are needed to be cut
down while 1,855,391 trees are needed to be moved to the next place. It has
come to the report that workers and employees have died during the construction
process of the airport and their families are paid off to keep things hidden. Beside
this, there were lots of controversies about the tender process and the money
that went un noticed.
CONSTRUCTION PHASES
The design team was led by the London based Grimshaw and also
included the Norway based Nordic office of Architecture and London Studio
Haptic.
FIRST STAGE
In this stage, there is the main terminal that is already constructed
with total passenger capacity of 90 million and also there will be the second
terminal building with the area of 170,000 meter square. There will be total of
88 aircraft jet bridges, indoor car park with the capacity of 12,000 vehicles. Two
runways are already under operation and use which are connected to 8 parallel
taxiways to the south of the main terminal and apron space of area 43,000,000
square feet. There are also 3 technical
blocks, ATC tower and other buildings to provide various services.
SECOND STAGE
This stage will deal with building another terminal building with
passenger capacity of 30 million annually. There will be constructed another
runway with three parallel taxiways to the north of the main terminal.
THIRD STAGE
In the third stage there will be constructed another terminal
building with annual passenger capacity of 30 million with an area of 500,000
meter square. Next runway will also be constructed. So, as the taxiways and
aprons will also be constructed.
FOURTH STAGE
In the fourth stage of construction, another building will be
added (terminal) and the last runway will be constructed.
After all the phases will constructed by 2030, there will be
in total 6 runways, 61 taxiways, an annual passenger capacity of 150 million
passengers. There will be in total 4 terminal buildings, 3 technical blocks,
165 aircraft jet bridges, 1 air traffic control tower and 8 ramp control towers.
Beside these, there will be lot of other
facilities which includes medical centers, convention centers, VIP lounges, indoor
and outdoor parking, power plants, waste facilities, shops and restaurants,
hotels, aircraft rescue and fire fighting stations etc.
MISCELLANEOUS
The opening ceremony took place on 20 October 2018. The first
flight was from Istanbul to Ankara on 31st October 2018 through
Turkish Airlines and the five flights are arriving and departing on the daily
basis. Altogether four runways are currently running. The two runways 17/35 are
4,100 meters long and 16/ 34 is 3,750 meters long.
Talking about the security aspect of the airport, there are
3,500 security personals and 1,850 police. There are CCTV cameras every 60 meters,
thermal cameras, fiber optic sensors every 720 meters and pan tilt zoom
cameras.
THANK YOU!!
NOTE: Discrimination and choices are two
completely different things. Discrimination may have choices but choices do not
have discrimination. It is never my intention to hurt someone's feeling,
emotions and pride. Above material is solely just for entertainment
purpose only and should be taken light heartedly.
Finally we all are humans. Humans have
different physical forms and mental forms and should be respected no matter
what. Abusing in any form whether it be verbal, emotional or physical surely is
a criminal act that deserves serious attention with punishment. In other hand,
jokes and comedy are completely different things which should exist within the
circle of loved and near ones and can be extended to some extent beyond the
limits but surely we need to be conscious towards the fact that our loved ones
are not hurt by our words and actions. Peace, love and respect should not be
destroyed to the extent that it becomes impossible to repair or rebuild.